GE PACE1000 Instrucciones De Seguridad Y Guía Del Usuario página 16

Equipo automatizado de calibración de presión
Ocultar thumbs Ver también para PACE1000:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 75
6.5 Multiple Unit Installation (Figure 8)
To install multiple units use stacking plugs to link the
first instrument and second instrument as follows::
1. Connector to rear panel of first instrument
(Ref Illustration).
2. Connector from controller/computer (Ref
Illustration).
3. Connector to rear panel of second
instrument (Ref Illustration).
4. Connect the IEEE 488 connector on the
controller/computer and the other
connector into the next instrument.
5. Repeat this procedure for all the instruments in the system.
Use the Supervisor set-up (communications) menu on each instrument to set-up the required
communication parameters (Ref: K0470, User manual 6.7).
K0467 Revision A
15
1
2
3
[EN] English

Publicidad

Tabla de contenido
loading

Tabla de contenido