1. Locate instrument in rack mount assembly (1).
2. Secure with the four M3 x 6 screws (2) (maximum length M3 x 8).
3. Support the instrument and connect the cables and pipes.
4. Refer to the electrical connections below before fitting the instrument into the
equipment rack.
5. Temporarily locate the two spigots* to each side of the equipment rack.
6. Locate and slide the instrument into the rack.
7. Locate the instrument on the spigots*.
8. Secure the instrument in the equipment rack with two of the screws and washers
(supplied).
9. Remove the two spigots* and replace with the remaining two screws and washers (sup-
plied).
4.2 Panel-mount option (Figure 6)
There must be enough space at the rear of the instrument for all the cables and pipes.
The length of the cables and pipes must allow for the removal and fitment of the instrument.
The cooling air of the instrument must not be obstructed.
Allow a free flow of air through the equipment rack and around the instrument, especially at high
ambient temperatures.