Swing-N-Slide Alpine PROJECT 611 Manual De Instrucciones página 132

Ocultar thumbs Ver también para Alpine PROJECT 611:
Tabla de contenido

Publicidad

PROJECT 613 • PROJECT 614
614
614
Cargo Net
Cargo Net
SIDE MOUNTING OPTION 2
613
613
LUMBER REQUIRED
(sold separately)
QTY
DESCRIPTION
2
5/4" x 6" x 10'
INSTRUCTIONS
1. Cut one 5/4" x 6" x 72-3/4". Cut one 5/4" x 6" x 40" and 42-1/2". Cut
remaining 5/4" x 6" x 28-3/4".
2. Remove the existing base board from the unit. NOTE: Save the hardware as
they will be re-used.
3. Attach the 5/4" x 6" x 72-3/4" board to the base as indicated in Fig. 1
using four (4) 2-1/2" screws and one (1) 2'' Lag Screw at each joint.
4. Attach remaining lumber to the unit as shown in Fig. 1 using three 3" screws
per joint.
5. Drill four 3/8" holes in the top board and four 3/8" holes in the bottom
board as indicated in Fig. 2. NOTE: Drill through the bottom of the 2" x 4"
board to the top. Insert the eye bolts of the Cargo Net through the holes of
the top board and secure all of them using a beam clamp, washer and loc
nut (see Fig. 3).
NOTE: Using a hacksaw, remove excess threads of the eyebolt as close to
loc nut as possible.
6. Place bolt covers over the bolts as indicated in Fig. 3. Secure bolt covers
using 2" screws.
7. Place two rope staples as indicated in Fig. 4. Thread the Cargo Net through
the holes of the base and loop through the staples as shown (Fig. 4).
Pull tight and secure by pounding staples tight against the base.
5/4" x 6" x 28-3/4"
Fig. 1
5/4" x 6" x 72-3/4"
5/4" x 6" x 40"
5/4" x 6" x 42-1/2"
60
Fig. 2
10"
10"
3/8'' Drill Holes
10"
10"
Washer and Loc Nut
Fig. 4
1''
1''
6-1/2"
10"
10"
6-1/2"
Fig. 3
Bolt Cover

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Alpine project 612

Tabla de contenido