Checklist Before Starting Pump Motor; Servicing Of A Double-Insulated Appliance - Briggs & Stratton PW101-2010 Manual Del Operador

Ocultar thumbs Ver también para PW101-2010:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Checklist Before Starting Pump Motor

Review the unit's assembly to ensure you have performed all of
the following.
1. Be sure to read Operator Safety and Operation before using
the electric pressure washer.
2. Check for properly tightened hose connections.
3. Check to make sure there are no kinks, cuts, or damage to
hoses.
4. Provide a proper water supply at an adequate flow (not to
exceed 100 °F).
5. Plug electrical cord into a properly grounded electrical source.

Servicing Of A Double-Insulated Appliance

In a double-insulated product, two systems of insulation are
provided instead of grounding. No grounding means is provided
on a double-insulated product, nor should a means for grounding
be added to the product. Servicing a double-insulated product
requires extreme care and knowledge of the system, and should
be done only by qualified service personnel. Replacement parts
for a double-insulated product must be identical to the parts they
replace. A double-insulated product is marked with the words
"DOUBLE INSULATION" or "DOUBLE INSULATED."
The symbol
means DOUBLE-INSULATED APPLIANCE.
11

Publicidad

Tabla de contenido
loading

Tabla de contenido