CEBORA S.p.A.
67
3 MAINTENANCE
WARNINGS
ANY INTERNAL INSPECTION OR REPAIR MUST BE CARRIED OUT BY QUALIFIED
PERSONNEL.
BEFORE BEGINNING MAINTENANCE OPERATIONS, UNPLUG THE EQUIPMENT
FROM THE MAINS AND WAIT FOR THE INTERNAL CAPACITORS TO DISCHARGE
(2 MINUTES).
3.1 Periodic inspection, cleaning
Periodically check that the equipment and all the connections are in proper working
order and that operator safety is therefore guaranteed.
Open the grilles on the power source and check inside the ventilation tunnels. Remove
any dirt or dust to ensure proper air flow and therefore adequate cooling of all internal
elements.
Check the condition of the output terminals, output cables and power source power
supply; replace if damaged.
Check the condition of the internal power connections and the electronic board
connectors; in case of "slow" connections, tighten or replace the connectors.
3.2 Welding system attachments and connectors
FIG. 3.2.1
3301045
17/09/2019