Pin Assignment; Instructions On Commissioning - Festo CPX-FVDA-P Serie Descripción Resumida

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 35
CPX-FVDA-P...

Pin assignment

CPX-FVDA-P with connection block CPX-M-4-M12x2-5POL
Pin assignment X1, X2
3
2
1
5
4
FE = Functional earth
n.c. = not connected
1) Unconnected voltage U
(auxiliary supply)
2) All output voltages are also derived from the internal contact rail U
Fig. 6
The metal thread of the connection block CPX-M-4-M12X2-5POL is connected
internally with pin 5 (functional earth FE).
5

Instructions on commissioning

The functionality of the safety equipment must be checked at appropriate inter-
vals. The operator is responsible for selecting the nature of the checks and the
intervals in the specified period. The check should be carried out in such a way as
to demonstrate faultless functioning of the safety equipment in its interaction with
all components.
Further information on commissioning can be found in the manual for the
P.BE.CPX-SYS-F-...
Festo CPX-FVDA-P... 1011NH English
Socket X1
4
1: 0V CH1
2: +24V CH1
5
3: F–DO(M) CH1
1
4: F–DO(P) CH1
X1
5: FE
Socket X2
1: 0V CH2
X2
2
2: +24V CH2
3: F–DO(M) CH2
4: F–DO(P) CH2
3
5: FE
can be used for supplying intelligent load systems
VAL
Pin assignment X3, X4
3
1)
1)
2)
2
2)
X3
X4
1)
1
1)
2)
5
2)
4
4
Socket X3
1: n.c.
5
2: n.c.
1
3: n.c.
4: n.c.
5: FE
Socket X4
2
1: n.c.
2: n.c.
3: n.c.
3
4: n.c.
5: FE
VAL
31

Publicidad

Tabla de contenido
loading

Tabla de contenido