Adjustment Of The Discharge Conveyor; Check The Level And/Or Oil Change - Nogueira VMN 4.0 Manual De Instrucciones

Ocultar thumbs Ver también para VMN 4.0:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

k) Pull back the cell, always observing the cable connecting the
weighing cell (11).
l) To replace the load cell, use this procedure in reverse.
Warning:
Always check if the cable is being pulled gently
and is slack enough not to be damaged.

Adjustment of the Discharge Conveyor

The adjustment is accomplished through the tensioning screws
(1). To do this, loosen the lock nut (3) and turn nuts (4) clockwise.
PS. Make the adjustment smoothly in both zones tensors.
To confirm that the zones are set to the same extent, measure
the distance (A).
If the measures are equal, tighten the lock nut (3). Otherwise,
repeat the procedure.

Check the Level and/or Oil Change

Oil Capacity
Gearbox = Fill until the plug hole (1)
Reducer = Fill until the plug hole (4).
Recommended Oil = See table on the next page.
Check the level:
Check every 50 hours or weekly work and complete if
necessary.
Gearbox: Remove the cap (1) and make sure the oil is filling at
least half of the box. If necessary, complete the level through the
plug hole (5).
VMN 4.0
10
8
11
A
2
1
3
4
9
5
23

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido