Festo CPV GE-ASI-4 Serie Breve Descripción página 20

Ocultar thumbs Ver también para CPV GE-ASI-4 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 27
4
Installation
4.1 Load voltage connection (additional supply)
As from hardware status HW 0105, the setting of a DIP
switch determines the connection via which the load volt
age supply for the outputs (valve solenoid coils) is pro
vided, see section 4.2.
Depending on what you have ordered, the following is set:
Configured valve terminal with additional supply
(order code AZ):
Factory setting: Load voltage supply via separate load
voltage connection ( 1 ).
Connect the additional supply with a cable socket type
ASI−SD−FK... to the load voltage connection.
Valves can be switched off during EMERGENCY STOP.
Configured valve terminal with additional supply
(order code AS):
Factory setting: Load voltage supply via AS−Interface
bus ( 3 ).
Sel the load voltage connection with a blanking plug
type ASI−SD−FK−BL (max. 0.3 Nm).
Electric sub−base as individual part or spare part
(type CPV..−GE−ASI−4−Z):
Factory setting: Load voltage supply via separate load
voltage connection.
If necessary, configure the load voltage supply with
the DIP switch, see section 4.2.
20
Festo CPV..−GE−ASI−... 0802d English

Publicidad

Tabla de contenido
loading

Tabla de contenido