DAV
7 Operation
8 Putting out of operation
9 Maintenance and cleaning
NOTE
• As the DAV cleaning station is integrated into a welding system, the
operating instructions of the welding components, such as welding torch
and robot control system, must be observed during operation.
• Make sure that the cleaning station BRS-CCi is operated with a front
sheet only.
NOTE
• As the cleaning station BRS-CCi is integrated into a welding system,
putting out of operation depends on the robot control. Please make sure
that the shutdown procedures for all components integrated in the
welding system are strictly observed.
Scheduled maintenance and cleaning is a prerequisite for a long life and a
trouble-free operation.
DANGER
Risk of injury due to unexpected start-up.
For the entire duration of maintenance, servicing, dismounting and repair
work, the following instructions must be adhered to:
• Switch off the power supply.
• Close off the compressed air supply.
• Pull the mains plug.
DANGER
Electric shock
Dangerous voltage due to defective cables.
• Check all live cables and connections for proper installation.
• Replace any damaged, deformed or worn parts.
NOTE
• The maintenance intervals given are approximate values and refer to
single-shift operation.
7 Operation
EN - 13