AERMEC VMF-RCC Manual Del Usuario página 100

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Electronic adjustment
E5 panel technical specifications
1
Date
The functional diagram of VMF-CRP expansion is described in fig. 8. As indicated in the
diagram, the control can manage:
A boiler (*)
Three heat recovery units
Three V.O.C. probes (room probes that are able to detect the following gases in the
air: carbon monoxide (CO), sulphur water (H2S), solvent vapours, alcanoli vapours,
cigarette smoke, exhaust fumes from cars, air produced by human breath, smoke of
burning wood, paper and plastic materials)
Address:
2
Boiler
100
2104_2696105_00
09/08/2017
Author
Rec. Cal. 1
Figure 2: Functional diagram of VMF-CR expansion
F. Carpanese
V.O.C probe
Rec. Cal. 3
Rec. Cal. 2
Group
Code
Type
indoor
V.O.C probe
V.O.C probe
Rec. Cal. 2
Rec. Cal. 1
Rec. Cal. 3

Publicidad

Tabla de contenido
loading

Tabla de contenido