Operating Position; Preparing The Boiler; Boring The Boiler Plate - Riello RS 55/M BLU Instrucciones De Instalación, Uso Y Mantenimiento

Ocultar thumbs Ver también para RS 55/M BLU:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

5.4

Operating position

 The burner is designed to operate only in
positions 1, 2, 3 and 4 (Fig. 7).
 Installation 1 is preferable, as it is the only
one that allows the maintenance operations
WARNING
as described in this manual.
 Installations 2, 3 and 4 permit operation but
make maintenance and inspection of the
combustion head more difficult.
D3928
The standard equipment motor protection
1)(Fig. 8), must be fixed on the bracket 2) using
the appropriate screws 3) with nut and washer
before fitting the casing.
WARNING
Fix the bracket to the front shield of the burner
with screw 4).
5.5

Preparing the boiler

5.5.1

Boring the boiler plate

Pierce the closing plate of the combustion chamber, as in Fig. 9.
The position of the threaded holes can be marked using the ther-
mal insulation screen supplied with the burner.
Installation
1
2
 Any other position could compromise the cor-
rect operation of the appliance.
 Installation 5 is prohibited for safety reasons.
DANGER
3
4
D7648
mm
RS 55/M BLU
13
GB
5
2
1
4
D455
A
B
195
275 - 325
Fig. 7
3
Fig. 8
Fig. 9
C
M12
Tab. F
20040559

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

2003848420038486

Tabla de contenido