Tractel tralift TS Manual De Empleo Y Mantenimiento página 13

Aparejo eléctrico de cadena
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Single fall operation:
CAUTION !
Pay attention to correct arrangement of suspension (see figure 2-7)! Grease the bearings thoroughly.
Figure 2-6
Double fall operation: Connect load side of chain end to chain retainer (3) and fix in housing guide rail. Assemble bottom sheave (1) with load
hook (2) in accordance with figure 2-9.
CAUTION !
Pay attention to correct arrangement of suspension (see figure 2-10)!
Do not twist chain lengthwise (see figure 2-8)! Grease the bearings thoroughly.
The chain end must be attached to the housing in accordance with figure 2-11.
Chain end:
The section of chain after the end stop (1) must be adjusted to the height of the chain bucket. The length of the section of chain must be selected
so that the end stop lies on the floor of the magazine when the chain runs into it (see figure 2-11).
Figure 2-9
2
The load hook (1) is connected to the chain using a shim
(2). Bolt (3) installation is important for power transmission
(see figure 2-6).
Figure 2-7
3
2
1
Types
TS 250/500
TS 1000
TS 1600/2000/2500
3
1
k1
Figure 2-8
... kg
k1 [mm]
41.0
43.0
49.0
Figure 2-10
k2
... kg
Types
k2 [mm]
TS 250/500
52.0
TS 1000
62.0
TS 1600/2000/2500
69.0
Figure 2-11
1
13

Publicidad

Tabla de contenido
loading

Tabla de contenido