DBI SALA NANO-LOK 3101207 Manual De Instrucciones página 13

Ocultar thumbs Ver también para NANO-LOK 3101207:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 40
Serial Number(s):
Model Number:
Inspection Date:
Component:
Inspection:
SRL
Inspect for loose fasteners and bent or damaged parts.
(Diagram 1)
Inspect the Housing (A) for distortion, cracks, or other damage.
Inspect the Swivel (B) and Swivel Eye (C) or Integral Connector (D) for
distortion, cracks, or other damage. The Swivel should be attached securely to
the SRL, but should pivot freely. The Swivel Eye or Integral Connector should
rotate freely in the Swivel.
The Web Lifeline (E) should pull out and retract fully without hesitation or
creating a slack line condition.
Ensure the SRL locks up when the Lifeline is jerked sharply. Lockup should be
positive with no slipping.
All labels must be present and fully legible (see Figure 16).
Inspect the entire SRL for signs of corrosion.
Web Lifeline
Inspect the web lifeline for concentrated wear, frayed strands, broken yarn,
(Diagram 2)
burns, cuts, and abrasions. The lifeline must be free of knots throughout its
length. Inspect for excessive soiling, paint build-up, and rust staining. Inspect
for chemical or heat damage indicated by brown, discolored, or brittle areas.
Inspect for ultraviolet damage indicated by discoloration and the presence of
splinters and slivers on the lifeline surface.
Load Indicator
Inspect the Load Indicator to determine if it has been activated. There should
(Diagram 3)
be no evidence of elongation and the cover should be secure and free of tears
or other damage.
End Connectors
Table 2 identifies the End Connectors that should be included on your
(Table 2)
Nano-Lok SRL model. Inspect all Snap Hooks, Carabiners, Rebar Hooks,
Interfaces, etc. for signs of damage, corrosion, and proper working condition.
Where present: Gates should open, close, lock, and unlock properly, and
Locking Buttons and Locking Pins should function correctly.
Diagram 1 — SRL Inspection
D
B
A
E
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Corrective Action/Maintenance:
Table 1 – Inspection and Maintenance Log
(See Section 2 for Inspection Frequency)
Diagram 2 — Web Lifeline
C
Cut
B
A
Frayed
E
Heavily
Soiled
Welding
Burns
Date Purchased:
Date of First Use:
Inspected By:
Diagram 3 — Load Indicator
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
Approved By:
Date:
13
Pass
Deployed and
Torn/Frayed
Webbing
Torn or
Broken
Cover
Fail

Publicidad

Tabla de contenido
loading

Tabla de contenido