1 - ON RECEIVING THE TOOL
Check that the following items are included in the kit supplied with the tool:
•
the certificate of conformity,
•
the safety instructions,
•
the CDROM,
•
the operator's manual.
On delivery, a separate kit can be provided according to the country of destination. The kit includes the following items:
•
the mains cord.
2 - INSTALLATION
Install the necessary accessories:
•
rotating suspension device
•
double safety device
•
...
Make sure that the operating voltage specified on the tool corresponds to the voltage of the electric network.
Make sure that the protection devices of the line are appropriate to the tool and that the safety instructions are respected.
The tool is directly connected to the mains. No other connection is required.
Switch the tool on.
To switch the tool on, you must always make the electric connections in the following order:
- connect the mains cord to the tool,
- then connect the mains plug to the electric network.
Similarly, when switching the tool off, you must always:
- disconnect the mains plug from the electric network,
- then disconnect the mains cord from the tool.
Never connect the mains cord to the tool or disconnect the mains cord from the tool, while the mains cord is
connected to the electric network.
Adjust the tool in Easy Programming Mode (quick adjustment):
•
set the torque with
•
check and validate the adjustment (see "PROGRAMMING", page 10).
The tool is ready to operate.
The access code is inactivated from factory, by default. If you should change it, using the Advanced Programming
Mode, do memorize or note your code.
EAP-TFlex tools
CHAPTER 3 - START-UP
or
,
EAP 2 - 65 - TF 2
Part no
6159932890
Issue no
02
Language English
Date
01/2010
166
Page
9 /