Preparation; Reception - Nogueira SOFT DUO 1300 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

4. Preparation

4.- PREPARATION

4.1- Reception

Moving the packed machine:
To unload or move the packed machine, always
use a forklift.
Do not hoist the packaged machine using winch,
crane, etc.
NOTE!
u
sually the machine is packed when destined for
.
export
Moving the unpacked machine:
To lift the unpacked machine, a winch with
appropriate capacity to the machine weigh must
be used (see 'Technical Characteristics'). Lift the
machine only by the points indicated in the
picture.
26
lifting points
Instructions Manual

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido