Installing Inner Channel and Routing Cables
Note: Be certain holes on inner channel (C) face in the same direction of opening on outer channel (B).
3
Note: Cables must be removed from projector before routing through channels. If cables are not removable from
projector, routing through channels is not an option.
guide projector cables into openings in channels then insert inner channel (C) into outer channel (B) as shown in
figure 3.1 or 3.3.
Position inner channel (C) to the desired extended position and secure using two M6 x 12 mm socket pin
screws (J) through clamp plate (G), through opening in outer channel (B) and into inner channel (C) as shown in
figure 3.2 or 3.4.
CEILING INSTALLATION
fig. 3.1
OP E nIn g
HOLES
C
Attaching Adapter Plate to Projector Mount
guide flanges of pivot/roll bracket (F) under flanges of adapter plate (O) by rotating 90° as shown in figure 4.1.
4
Secure pivot/roll bracket (F) to adapter plate (O) by using two M5 x 10 mm screws (L) and two locknuts (M) as
shown in figure 4.2.
F
fig. 4.1
FLANgES
Visit the Peerless Web Site at www.peerlessmounts.com
fig. 3.2
B
J
G
B
C
gUIDE
CABLES IN
CHANNELS
FLANgES
O
WALL INSTALLATION
(ExCEPT FOR PPC MODELS)
fig. 3.3
HOLES
C
fig. 3.4
L
fig. 4.2
F
M
7 of 33
For customer care call 1-800-865-2112 or 708-865-8870.
B
OPEn In g
J
G
B
C
O
ISSUED: 12-26-07 SHEET #: 055-9494-1