Commissioning Of The Inverter From The Battery; Configuration Of The Byd B-Box Premium Hvs/Hvm; Black Start - Ingeteam INGECON SUN STORAGE 1Play TL M Manual De Uso Y Configuración

Ocultar thumbs Ver también para INGECON SUN STORAGE 1Play TL M:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Ingeteam

4 Commissioning of the inverter from the battery

This chapter describes how to do the commissioning of the inverter when is supplied by the
battery BYD B-BOS Premium HVS/HVM. Also is possible to do the commissioning of the
inverter when the inverter is connected PV field (chapter 3), which is simpler.
The LEDs of the cover indicates that the inverter is ON. Then, it is necessary to access the
inverter.
For more details, of how to access the inverter, check the INGECON SUN STORAGE 1Play
"Installation and Operation Manual" available in the Ingeteam Webpage.
4.1

Configuration of the BYD B-BOX Premium HVS/HVM

First, move the circuit breaker to ON position to turn the battery on. Then, configure the battery
to work with the inverter through the "BYD Be Connect" app.
In the interface of the battery the type of inverter that is going to work with must be selected. In
this case:
Type of inverter: "INGETEAM HV"
Choose the type of battery: HVS or HVM
4.2

Black start

The ISS 1Play, as a compatible inverter, can be supplied from the BYD B-BOX Premium
HVS/HVM batteries, without PV. Only for a limited time.
To do so, once all the previous steps have been completed, the following steps must be
followed:
Use and settings of the INGECON SUN STORAGE 1Play TL M working with BYD B-BOX
Premium HVS/HVM

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido