LUND Genesis GMT900 Instrucciones De Instalación página 4

Presion / sello y cascara tonneau
Tabla de contenido

Publicidad

Installation Steps
Insert the upper clamp all
the way into the side rail
and tighten with the allen
wrench (G) provided.
6
F
B
The bow rests upon the top of the clamp with each of its legs draped over
the sides.
Some truck boxes are not square and require bows of different lengths.
On these trucks the bows will be marked as Bow 1, Bow 2, etc.
The location closest to the cab is bow 1.
7
PAGE 4 of 24
1703137
Rev.1
G
C
F
D
B
D
F
Étapes d'installation
Dérouler la bâche.
8
A
Commencer aux coins et fixer la bâche aux rails du plateau.
9
PAGE 21 of 24
1703137
Rev.1
A

Publicidad

Tabla de contenido
loading

Tabla de contenido