Installation Steps; Étapes D'installation - LUND Genesis GMT900 Instrucciones De Instalación

Presion / sello y cascara tonneau
Tabla de contenido

Publicidad

Installation Steps

H
A
E
Install corner pads on all four corners.
Remove and discard the protective paper liner from the underside of the tonneau rails.
1
Place the front rail and cover assembly on the top of the truck bed next to the cab.
The cover has tie straps to keep it from being damage when bulk hauling.
2
FRONT
Connect the driver and passenger rails to the front rail. The arrow points to the front of the truck.
Slide the rail over molded leg of the front rail corner. You will hear a click sound when rail is in the
correct position.
With tailgate closed, install the rear rail onto the side rails.
3
PAGE 2 of 24
1703137
Rev.1
B
C
A
A
C
Étapes d'installation
ATTENTION : PORTER DES LUNETTES DE SÉCURITÉ POUR LE
TRAVAIL DE DÉCOUPE
Pour installation avec des doublures de caisse.
Découper une ouverture de 2,85 cm x 7,60 cm (1 1/8 po x 3 po) dans la
doublure de caisse, à l'emplacement de chacune des brides.
B
11
Inspection après installation.
1. Une fois l'installation terminée, vérifier le fonctionnement
ainsi que le serrage de toutes les brides.
3"
1 1/8"
F
PAGE 23 of 24
1703137
Rev.1

Publicidad

Tabla de contenido
loading

Tabla de contenido