LUND Genesis GMT900 Instrucciones De Instalación página 6

Presion / sello y cascara tonneau
Tabla de contenido

Publicidad

Installation Steps
Unroll cover and follow directions below to fasten cover to tonneau rails.
A
Place tan tip of the cover retainer under the
A
upper lip of the tonneau rail.
Rotate the retainer downward.
The tension of the cover will fully engage
B
the cover retainer into the tonneau rail.
A
NOTE: It is recommended to complete
this step on all three sides before pro-
ceeding to the next step.
B
A
Using palm pressure, glide hand down the
length of each tonneau rail to lock the
cover retainer into the tonneau rail.
To disengage cover, pull upward and out,
starting at a corner end.
B
10
PAGE 6 of 24
1703137
Installation Steps
Rev.1
A
Centrer le bâti sur le camion. Centrer ensuite d'un côté à l'autre le système des rails latéraux.
4
F
Pour faciliter l'installation, les emplacements des
brides ont été marqués sur les rails latéraux.
Centrer une bride à chacun des emplacements
indiqués sur les rails latéraux.
5
C
B
F
Pour l'utilisation avec des doublures de caisse, se reporter aux instructions
relatives aux doublures de caisse, illustration n° 11.
PAGE 19 of 24
1703137
Rev.1

Publicidad

Tabla de contenido
loading

Tabla de contenido