Eaton Powerware 9125 Guia De Instalacion página 27

Ocultar thumbs Ver también para Powerware 9125:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

5.
Carefully position the cabinets upright (see Figure 14).
NOTE The EBM must be installed to the right of the UPS. The PDM must be installed
between the UPS and EBM, as shown in Figure 14.
UPS
6.
Align each joining bracket (provided in the EBM accessory kit or
PDM carton) with the adjacent cabinet screw holes and secure with
the supplied screws (see Figure 15).
®
EATON Powerware
9125 (9910-P64) UPS Installation Guide for IBM
Figure 13. UPS Cabinet with Pedestals
EBM
UPS
Figure 14. UPS Tower Configuration
®
Applications
INSTALLATION
PDM
EBM
S
13
164201637 Rev A

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

9910-p64

Tabla de contenido