Ocultar thumbs Ver también para Powerware 9125:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

INSTALLATION

Tower Setup

The UPS and any optional cabinets (PDM or EBM) must be stabilized
with pedestals or joining brackets. The setup varies depending on the
number of cabinets you are installing:
1.
2.
3.
4.
12
EATON Powerware
For one cabinet, both sets of pedestals must be installed (provided in
the P64 accessory kit). Complete Steps 2 through 4.
For two or more cabinets, the pedestals are not installed. Skip to
Step 5 to install the joining brackets.
Place the UPS horizontally, so that the left end of the cabinet is
accessible (see Figure 12).
Align the UPS pedestals over the holes on the end of the UPS as
shown in Figure 12. Secure the pedestals with the supplied screws.
Figure 12. Installing the UPS Pedestals
Carefully position the cabinet upright (see Figure 13).
Continue to "Power Connections and Startup" on page 21.
®
9125 (9910-P64) UPS Installation Guide for IBM
®
S
Applications
164201637 Rev A

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

9910-p64

Tabla de contenido