Installing The Internal Batteries - Eaton Powerware 9125 Guia De Instalacion

Ocultar thumbs Ver también para Powerware 9125:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

INSTALLATION
12. Slide the UPS rear hold-down bracket into the slot on the UPS rear
13. Continue to the following section, "Installing the Internal Batteries."

Installing the Internal Batteries

The UPS battery trays are heavy (28.1 kg/62 lb). A minimum of two people are required to lift
the battery trays into the UPS chassis.
To install the battery trays into the UPS chassis:
1.
2.
10
EATON Powerware
panel. Repeat for each cabinet.
Be sure the rear hold-down bracket is fully seated and then tighten
the wing nut. The UPS is now secured in the rack.
Figure 8. Securing the Back of the UPS
Locate the cartons labeled "Battery Tray" (IBM PN 42R4316).
Verify that the battery circuit breaker on the UPS rear panel is in the
OFF position (see Figure 16 on page 15).
®
9125 (9910-P64) UPS Installation Guide for IBM
C A U T I O N
®
S
Applications
164201637 Rev A
Rear Hold-Down
Bracket

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

9910-p64

Tabla de contenido