Ocultar thumbs Ver también para Powerware 9125:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

INSTALLATION

PDM Installation

The following steps explain how to install the optional FC 6571 PDM or
FC 6572 PDM. Figure 18 on page 18 shows a typical installation only.
See "PDM Rear Panels" on page 18 for the rear panel of each model.
1.
2.
3.
Table 10. FC 6572 PDM Models Input/Output Voltage Settings
16
EATON Powerware
Verify that the PDM output circuit breaker is in the OFF position.
Verify that the bypass switch on the PDM is in the NORMAL
position (see Figure 17).
Bypass Switch
Figure 17. PDM (with Front Cover Removed)
FC 6571 PDM Models: Continue to Step 4 to determine the
input/output voltage settings.
FC 6572 PDM Models: Table 10 shows the input/output voltage
settings. Skip to Step 5 to continue the PDM installation.
Input Voltage (from UPS)
208
220
230
240
®
9125 (9910-P64) UPS Installation Guide for IBM
Voltage Switch
PDM Output Voltage
208
220
230
240
®
S
Applications
164201637 Rev A

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

9910-p64

Tabla de contenido