Putting Out Of Operation; Maintenance And Cleaning - Abicor Binzel PP Serie Manual De Instrucciones

Ocultar thumbs Ver también para PP Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

7 Putting out of operation

7 Putting out of operation

8 Maintenance and cleaning

EN - 12
NOTE
• Liquid-cooled cable assemblies may start leaking if overheated. This is
why the cooling unit should continue running for approx. 5 min. after
welding.
1 Stop welding.
2 Wait until the shielding gas flow has subsided and then switch off the power
supply.
3 Close the valve of the shielding gas cylinder.
DANGER
Risk of injury due to unexpected start-up.
For the entire duration of maintenance, servicing, dismounting and repair
work, the following instructions must be adhered to:
• Switch off the power supply and close off the compressed air supply.
• Pull the mains plug.
DANGER
Electric shock
Dangerous voltage due to defective cables.
• Check all live cables and connections for proper installation.
• Replace any damaged, deformed or worn parts.
NOTE
• The maintenance intervals given are approximate values and refer to
single-shift operation.
• Maintenance and cleaning work may only be carried out by qualified
and trained specialists.
• Always wear your personal protective clothing when performing
maintenance and cleaning work.
PP

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Pp 24dPp36dPp240dPp401d

Tabla de contenido