Putting Out Of Operation; Maintenance And Cleaning; Electric Shock - Abicor Binzel ABIPLAS WELD CT Serie Instructivo De Servicio

Ocultar thumbs Ver también para ABIPLAS WELD CT Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

8 Putting out of operation

8 Putting out of operation

9 Maintenance and cleaning

EN - 18
NOTE
®
• As the ABIPLAS
welding system, putting out of operation depends on the robot control
system. Please make sure that the shutdown procedures for all
components integrated in the welding system are strictly observed.
1 Switch off main current and pilot current.
2 Switch off the power supply.
3 Close the shut-off valves for the gas supply.
Regular and lasting maintenance and cleaning are the prerequisite of a long
life and a trouble free operation.
DANGER
Risk of injury due to unexpected start-up.
For the entire duration of maintenance, servicing, dismounting and repair
work, the following instructions must be adhered to:
• Switch off the power supply.
• Cut off the gas supply.
• Cut off the compressed air supply.
• Pull the mains plug.
DANGER

Electric shock

Dangerous voltage due to defective cables.
• Check all live cables and connections for proper installation.
• Replace any damaged, deformed or worn parts.
NOTE
• The maintenance intervals given are approximate values and refer to
single-shift operation.
• Maintenance and cleaning work may only be carried out by qualified
and trained specialists.
• Always wear your personal protective clothing when performing
maintenance and cleaning work.
WELD CT welding torches are integrated into a
®
ABIPLAS
WELD CT

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Abiplas weld 150 ct20Abiplas weld 250 ct20

Tabla de contenido