Descargar Imprimir esta página

Mettler Toledo EasyMax 102 Instrucciones De Instalación página 2

Ocultar thumbs Ver también para EasyMax 102:

Publicidad

Idiomas disponibles

Idiomas disponibles

2
Short Installation Instructions
Please follow these instructions carefully to ensure a secure and successful installation
of your EasyMax
102 Instrument. Please check the EasyMax
for more detailed information such as a fully illustrated part list for standard and optional
equipment.
Cool the instrument with salt-free tap water, ethanol, ethylene glycol, silicone oil, or a cryostat and purge
it with dry air, nitrogen or argon before switching on the EasyMax
Check the minimum flow rates of purge gas and cooling liquid. If the given flow rates lie below these
values, the instrument can sustain damage. See "Pre-Installation Guide" or the Operating Instructions.
Attach both Pt100 temperature (Tr) sensors before you start the EasyMax
error message is shown after the start procedure. Further information can be found in the Operating
Instructions.
Purge gas connection
Use the red PVC tubes for purge gas connection.
Fit purge gas tubes to connectors with tube couplings
included in the standard delivery. Both reactors can
be purged simultaneously with gas.
Product Catalog
102.
102! If you forget it, an
PVC tubes
Use uncolored PVC tubes to connect cooling liquid.
Hose clamps will improve grip.
Step 1 – Connect tubes, cables, and devices
according to the scheme
Rear side connections
Cooling liquid inlet
RS232 interface
1)
Power supply
Network
1)
Touchpad
Purge gas inlet
Cooling liquid outlet
Front side connections
Purge gas outlet
Overhead stirrer
1)
Pt100 temperature (Tr) sensor
1)
Thermostat
USB port
Power push button and status LED
1) Optional equipment
3

Publicidad

loading