SPALDING M6A40201 Manual Del Usuario página 37

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

26.
Install net (43).
A.
43
27.
Apply Height Adjustment and Moving Label (46) to front of pole, where it is clearly visible.
HEIGHT ADJUSTMENT
46
TO ADJUST BACKBOARD:
1. While holding handle, remove pin.
2. Move elevator up or down to
desired height.
3. Replace pin full length to lock
system at desired height.
MOVING SYSTEM
1
2
3
4
OUTSIDE VIEW
B.
34
1
3
2
2
1.
Adjust basketball backboard
height to lowest position.
2.
While holding pole, rotate
basketball system forward
until wheels engage with
ground.
3.
Move basketball system to
desired location.
4.
Carefully rotate basketball
system upright.
5. Check system for stability.
511679
05/05
C.
34
Size = 4" x 5.5"
Corner Radius = 3/8"
Die Cut Label
3.25 Mil Vinyl
All Temp. Permanent Adhesive
1 Mil. Polypropolyne Overlaminate
Illustrator 8.0 = EPS
Backing + 1/16 Circumference
Rolls of 500
37
D.
43

Publicidad

Tabla de contenido
loading

Tabla de contenido