Connection - De Dietrich DTV 714 Manual De Instalación Y Utilizacion

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

9964-2701_ML.qxp
06/04/2007
1 / INSTALLING YOUR APPLIANCE
EN

Connection

These hobs must be connected to the mains using a socket in compliance with publication CEI
60083 or an all-pole circuit-breaker device in compliance with the installation rules in force.
When power is first supplied to your hob, or after an extended power cut, an indicator light will
appear on the control panel. This information will disappear after 30 seconds.
• Hook-up of 220-240V
Blue
Brown
N
L
32A
Phase
Neutral
• Hook-up of 2x230V 2L+2N
Separate the wires before connection.
Brown
Blue
N1
N2
Neutral
• Hook-up of 400V 3
16:16
Page 20
~
Black or grey
Green/yellow
16A
Earth
- 16A
• Hook-up of 400V 2N
~
Separate the 2 phase wires (L1 and L2) before
connection.
Black-grey
Green/yellow
L1 L2
Phase
Earth
With hook-up of 400 V 2N three phase, verify
that the neutral wire is properly connected.
- 16A
~
replaced by the manufacturer, its after-
sales service or a person with a similar
qualification to prevent danger.
20
Green/yellow
Blue
Brown
N L
Neutral
Phase
Earth
- 16A
~
Black-grey
Brown
Green/yellow
Blue
L1 L2
N
Neutral
Phase
Earth
Warning
If the cable is damaged it must be

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Dtv 715Dtv 718Dtv 716Dtv 720Dtv 724Dtv 725

Tabla de contenido