2
Key for
1
Readout level
1-01
Cumulated energy since
commissioning
1-02-1
Display test "everything on"
1-02-2
Display test "everything off"
1-02-3
Display test "UHF ON/OFF"
1-02-4
Due date value
1-02-6
Due date*
4
Maximum value level
4-01-1
Max. output (last period)
4-01-2
Max. output date (last period)
4-02-1
Max. output (current period)
4-02-2
Max. output date (current period)
4-03-1
Max. rate of flow (last period)
4-03-2
Max. rate of flow date (last period)
4-04-1
Max flow (current period)
4-04-2
Max flow date (current period)
* Before the first due date: Production date or optional starting date
LT = long button push (> 2s)
KT = brief button push (< 2s)
Parametrisation level - for setting the variable device properties
- 5-01 "Unit"- energy unit (kWh/ GJ)
- 5-02 "InSTALL" - installation location (RL -outlet/ VL -inlet)
These levels show the "editing pen" on the display after you press the key long. As soon
as it becomes visible, let go of the key, the current selection then starts flashing.
Briefly press the key to move on to the next possible selection. Press the key until the
selection stops flashing and the currently set selection is accepted. If the selection is not
accepted (flashing continues), then no re-parametrisation takes place.
Restriction of parametrisation, see "Device properties" chapter
16
2
Service level
2-01
Cumulated volume since commissioning
2-02
Current flow rate
2-03
Inlet temperature
2-04
Outlet temperature
2-05
Temperature difference
2-06
Current performance
2-07
Next due date
2-08
Device number
2-09
Firmware version number
5
Test / parametrisation level
5-01
"Energy unit" parametrisation
5-02
"Installation location" parametrisation
5-03
"Energy test" test mode
5-04
"Energy test with simulated volume"
test mode