Minebea Intec IUXS4 Serie Instalación Y Advertencias De Seguridad página 6

Ocultar thumbs Ver también para IUXS4 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Installation Instructions
§ Please read the enclosed operating
§ After unpacking the equipment,
§ Open the wooden pallet at the top.
$ Lift the scale until it is completely
§ Fasten the straps in four places,
– Front: handles
– Rear: carrier frame.
§ Lift the scale evenly.
§ Move the scale to the place of instal-
!
6
Bedienungsanleitung IUXS4
Unpacking the Equipment
instructions carefully before putting
the equipment into operation.
please check it immediately for any
visible damage.
free of the wooden pallet
(see below).
Note:
The height of the load-bearing
feet can be adjusted. The scale
is adjusted at the factory for
a level floor. Improper handling
of the scale can result in damage to
the components, which negatively
affects the safety of the device.
Make sure to read and follow the
safety instructions.
as shown here:
lation.
Warning: Danger of personal injury!
Do not stand or move beneath the
scale while it is suspended.
Make sure to read and follow the
safety instructions.
§ Lower the scale evenly to the place
of installation.
$ The place of installation must be
clean, level and able to withstand
the weight of the scale and any load
that will be placed on it. Eliminate
any unevenness of the floor surface.
§ Level the scale at the place of instal-
lation using the level indicator.
Check the angularity of the base
frame and make sure it is correct.
Measure the diagonals to check this
dimension.
§ Mark the positions for drilling
anchor holes.
– 8 fastening anchors, sizes M10
to M15 (length: 85 mm),
are included in delivery
§ Clear the place of installation.
Lift the scale evenly.
Warning: Danger of personal injury!
!
Do not stand or move beneath the
scale while it is suspended.
Make sure to read and follow the
safety instructions.
§ Drill the holes (size: M10) for the
anchors. Minimum depth: 65 mm.
§ Check the depth; remove all dust
from the bore hole (use a blower if
necessary).
§ Clean the place of installation.
§ Carefully re-position the scale at
the place of installation. Make sure
to align the holes drilled for the
anchors with the bore holes on the
base frame.
§ Level the scale at the place of
installation using the level indica-
tor. Check the angularity of the base
frame and make sure it is correct.
Measure the diagonals to check
this dimension.
§ Fasten the scale as follows:
Drive in the anchors and tighten the
bolts (size M10; wrench size: 17).
§ Check the gap between the down-
holders (right and left) and the scale;
it should be 2 mm.
– Use a 2-mm thick spacing plate
or
– Measure the gap.
$ Check this gap at regular intervals
to make sure the 2-mm space is
maintained.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Iuxs4-ce serie

Tabla de contenido