Transportation And Handling; Installation; Installing The Pump; Electrical Connection - Calpeda NCE EI Instrucciones De Uso

Bombas circuladoras de bajo consumo energético
Ocultar thumbs Ver también para NCE EI:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 38

5. TRANSPORTATION AND HANDLING

The product is packed to maintain the content intact.
During transportation avoid to stack excessive weights. Ensure that during the transporta-
tion the packed cannot move.
The transport vehicles must comply, for the weight and dimensions, with the chosen pro-
duct.
5.1 Handling
Handle with care, the packages must not receive impacts.
Avoid to impact onto the package materials that could damage the pump.

6 INSTALLATION

OFF
6.1 Dimensions
For the dimensions of the device refer to the annex "Dimensions" (paragraph 12.1 Annexes).
6.2 Ambient requirements and installation site dimensions
The customer has to prepare the installation site in order to guarantee the right installation
and in order to fulfill the device requirements (electrical supply, etc...).
The place where the device will be installed must fulfill the requirements in the paragraph 3.2.
It's Absolutely forbidden to install the machine in an environment with potentially explosive
atmosphere.
6.3 Unpacking
Inspect the device in order to check any damages which may have occurred
i
during transportation.
Package material, once removed, must be discarded/recycled according to local
laws of the destination country.

6.4. Installing the pump

Ensure the inside of pipes are clean before connection.
Mount pump in an easily accessible position.
To avoid draining and refilling of the whole pipe system when dismantling the pump, it is
recommended to provide gate valves on the suction and delivery sides.
The pump must be installed with the shaft axis horizontal (cap. "12.2 fig. 1).
In order to obtain a correct terminal box position, the motor housing must be turned once
the screws have been loosened (cap. "12.2 fig. 2). Change the terminal box positions as
shown (cap. "12.2 fig. 3).
ATTENTION: Take care not to damage the casing gasket. The pipes connected to
the pump should be secured to rest clamps so that they do not transmit stress,
strain or vibrations to the pump.
The arrow on the pump casing indicates the direction of water flow (cap. "12.2 fig. 4).
6.4.1. Insulating the pump
The loss of heat from the pump can be limited using thermo-insulating shells (standard
supplied with model NCE EA). Shells for the other pumps can be ordered separately.

6.5 Electrical connection

OFF
Electrical connection must be carried out only by a qualified electrician in
accordance with local regulations.
Follow all safety standards.
NCE. Rev. 5 - Operating Instructions
EN
Page 15 / 96

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Nce eaNce elNce es

Tabla de contenido