7
Assembly and installation, first commissioning
7.1
Safety
See Chapter 2 Safety.
7.2
Assembly and installation
Fitting and installation of the machine is performed by specialist personnel at the firm Gebhardt
Anlagentechnik GmbH & Co. KG. The machine must only be taken into operation at the customer
site.
7.3
First commissioning
First commissioning of the machine is performed by specialist personnel at the firm Gebhardt
Anlagentechnik GmbH & Co. KG.
Original operating manual packing presses
10.07.2017
Assembly and Installation, First Commissioning
Page 53 of 123
English