10
Maintenance
10.1
Safety
See Chapter 2 Safety.
10.2
Service address
See Chapter 1 Important basic information.
10.3
Control procedure and testing devices
DGUV regulation 3:
According to DGUV regulation 3 (BGV A3), the packing press is classed as an electrical appliance
and hence must be tested after maintenance, changes to the machine and every 4 years according
to VDE 0701-0702.
10.4
Inspection and servicing plan
d = daily, w = weekly, m = monthly, y = half-yearly
Activity
Checking the hydraulic oil level in the tank
Original operating manual packing presses
10.07.2017
Maintenance
d
w
m
Page 59 of 123
English
y
x