Operation; Safety; Operating Modes Pp40; Operating Modes Pp80 / Pp150 - GG PP40 Manual De Instrucciones Original

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

8

Operation

8.1

Safety

See Chapter 2 Safety.
8.2

Operating modes PP40

-
Manual mode
8.3

Operating modes PP80 / PP150

-
Manual mode
-
Automatic mode
8.4

Taking into service PP40

8.4.1

Start-up after a scheduled shut-down PP40

Before any start-up or after longer periods of decommissioning of the machine, the following
procedure must be followed:
-
Check general condition.
-
Ensure all safety equipment is operational.
-
Ensure all safety devices are correctly fitted.
-
Ensure that the necessary servicing (see Maintenance) has been carried out.
Before you can take the packing press into operation, you will require the following:
-
CEE socket 16 A fused 3 x 16 A
-
Tank or container to collect the juice produced
For commissioning, follow this procedure:
-
Connect the tank or container for the juice produced to the outflow funnel (5), using hoses.
-
Plug in the mains plug into the matching CEE socket with appropriate fusing.
-
Switch the main switch (10) on.
-
Now production can commence.
8.4.2

Restarting after a longer shut-down period PP40

See start-up after a scheduled shut-down.
Original operating manual packing presses
10.07.2017
Operation
Page 54 of 123
English

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Pp80Pp150

Tabla de contenido