Appendix 1: Sequence Of Operation (Block Diagram) - ESAB Cutmaster 120 Manual Del Usuario

Ocultar thumbs Ver también para Cutmaster 120:
Tabla de contenido

Publicidad

APPENDIX 1: SEQUENCE OF OPERATION (BLOCK
ACTION:
Close external
disconnect switch.
RESULT:
Power to system.
ACTION:
Connect work cable to workpiece.
Set output amperage.
RESULT:
System is ready
for operation.
ACTION:
Protect eyes and activate
Torch switch (START)
RESULT:
Fans turn on. Gas flows briefly,
then stops.Gas restarts.
DC indicator
Pilot arc established.
ACTION:
Release Torch switch.
RESULT:
Main arc stops.
Gas flow stops after post - flow.
(Fans will continue to run for
10 minutes after the Torch switch
[START] is removed)
300X5398
All manuals and user guides at all-guides.com
DIAGRAM)
ACTION:
ON / OFF switch to ON
RESULT:
AC indicator
ON.
GAS indicator
ON
when input
pressure is adequate
for power supply operation.
Power circuit ready.
ON
Power supply fans shut off.
ESAB CUTMASTER 120
ACTION:
RUN /
Rapid Auto Restart /
SET / LATCH switch
to SET
RESULT:
Gas flows to set
pressure.
Torch moved away from work (while
PILOT ARC
transfer distance of workpiece.
ACTION:
ON / OFF switch
to OFF
RESULT:
All indicators off.
APPENDIX
ACTION:
RUN / Rapid Auto Restart /
SET / LATCH
switch to RUN
(for most applications)
or to
Rapid Auto Restart
(for gouging, trimming,
or expanded metal
applications)
or to
LATCH
is used for specific applications
(torch switch can be released
after main arc transfer).
RESULT:
Gas flow stops.
ACTION:
still activated).
RESULT:
Main arc stops.
Pilot arc automatically
restarts.
ACTION:
Torch moved within
RESULT:
Main arc transfers.
Pilot arc off.
ACTION:
Unplug input
power cord or
open external
disconnect.
RESULT:
No power to system.
Art #A-08793
A-1

Publicidad

Tabla de contenido
loading

Tabla de contenido