Power Supply; Loading The Plc Program; Starting The Sequence - Festo 8038802 Breve Descripción

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

10.4 Power supply

The stations are supplied with electrical power from a power supply unit with an output voltage of
24 V DC (max. 5 A).
The entire station is supplied with electrical power from the rack PLC.

10.5 Loading the PLC program

Proceed as described in the user's manuals for the programming software used in order to load the PLC
program.
Current PLC programs for various controllers can be found on the Internet at the following website:
www.ip.festo-didactic.com

10.6 Starting the sequence

1. Check power supply and compressed air supply.
2. Before manually resetting, remove the workpieces from the transfer points at the modules or the
stations.
3. Turn the key switch to the horizontal position.
4. Execute the reset procedure. The reset procedure is prompted by the illuminated RESET button and is
executed after the button has been pressed.
5. Turn the key switch to the vertical position.
6. The LED on the start button lights up (the system is ready to start).
7. Press the start button.
8. Set a workpiece onto the beginning of the conveyor.
9. The station starts the sequence.
Notes
The sequence can be stopped at any time by pressing the emergency stop button, or by
pressing the STOP button at the end of the cycle.
The following applies when several stations are combined:
The individual stations are aligned in the order opposite the direction of material flow.
The "buffer full" signal lamp lights up wen 6 workpieces are located on conveyor belt
2. Remove the workpieces and execute the reset procedure.
© Festo Didactic 8038803
Separating station
41

Publicidad

Tabla de contenido
loading

Tabla de contenido