Measuring Pro Station – Operating instructions

12.5 Power supply

The stations are supplied with electrical power from a power supply with an output voltage of 24 V DC
(max. 4 A).
The entire station is supplied with electrical power from the PLC.

12.6 Loading PLC programs

Proceed as described in the user manuals for the programming software used in order to load the PLC
programs.
Current PLC programs can be found at the following website in the Internet:
www.ip.festo-didactic.com

12.7 Starting the sequence

1. Check power supply and compressed air supply.
2. Start all controllers and the PC.
3. Before resetting, manually remove the workpieces from the module and station transfer points.
4. Turn the key switch to the horizontal position.
5. Perform a reset procedure. The reset procedure is prompted by the illuminated RESET button and is
executed after the button has been pressed.
6. Wait until the reset LED goes out.
7. Turn the key switch to the vertical position.
8. The LED on the start button lights up (the station is ready to start).
9. Enter an order in the MES computer.
10. Press the start button.
11. The station starts the sequence.
40
The sequence can be interrupted at any time by pressing the EMERGENCY STOP
button or at the end of the cycle by pressing the STOP button.
The following applies when several stations are combined:
The individual stations are aligned in the reverse order to the flow of materials.