Note: You must purchase both the Dual Fuel Regulator
and Carburetor Kit for proper high altitude operation.
REMOTE START
Verify that the area around the generator is clear before
remote starting the generator.
The remote start key fob included with the generator should
be attached to the recoil handle or control panel. If your
unit was shipped without a key fob, contact Westinghouse
customer service.
The generator can be started remotely from up to 99 feet
(30 meter) using the remote start key fob.
Note: As the batteries in the remote start key fob drain,
operational distance will decrease.
PAIRING THE REMOTE START
Remote replacement batteries: (2) CR2016
Replacement remote: # 100714A
If the remote start key fob is replaced or needs re-paired to
the generator, follow this procedure.
1. Turn the generator battery switch to the ON position.
The power indicator light will illuminate.
2. Push and hold the red Pairing button on the side of the
control panel until the START/STOP button illuminates.
Pairing button
3. Push and hold the STOP button on the key fob until the
START/STOP button illumination turns OFF. Release
the button. The START/STOP button will illuminate after
the button is released.
WARNING
Battery switch
Push button START/STOP
Power indicator
OPERATION
START
STOP
4. Push and hold the START button on the key fob until the
START/STOP button illumination turns OFF. Release
the button. The START/STOP button will illuminate after
the button is released.
5. Push the Pairing button on the side of the control panel
until the START/STOP button illumination turns OFF.
Release the button.
6. Turn the generator battery switch to the OFF position.
The remote is now paired.
FUEL SELECTOR SWITCH
Position the fuel selector switch on the front control panel
to the desired fuel choice.
Turn the fuel selector switch fully upward for gasoline
operation.
Turn the fuel selector switch fully downward for propane
operation.
BREAK-IN PERIOD
For proper break-in, DO NOT exceed 50% of the rated
running watts (3750 watts) during the first five hours of
operation.
Vary the load occasionally to allow stator windings to heat
and cool and help seat the piston rings.
Westinghouse Outdoor Power Equipment, LLC | 17
Key Fob
Activation Light
START Button
STOP Button