Commissioning After Stationary Installation; Commissioning Portable Installations; During Operation - Wilo Drain TM 32 60Hz Instrucciones De Instalación Y Funcionamiento

Ocultar thumbs Ver también para Drain TM 32 60Hz:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Commissioning
7.1

Commissioning after stationary installation

For commissioning after stationary installation, carry out a test run with three pump-
ing processes. Check the switching points during the test run.
▶ Once three pumping processes have been completed without problems, the test
7.2

Commissioning portable installations

Once the pumping process has been completed and the pump is no longer required,
remove the pump.
7.3

During operation

CAUTION
Do not allow the pump to dry run!
Do not run the pump without fluid (dry run). Switch off the pump once the resid-
ual water level has been reached. Dry running may destroy the seal and cause the
pump to be irreparably damaged.
Installation and operating instructions Wilo-Drain TM/TMW 32 60Hz
Installation and electrical connection have been carried out as specified.
Commissioning elements have been checked.
1. Switch on the pump.
Plug in the plug. Switch on the main switch if available.
2. Open all gate valves in the pressure pipe.
3. Flood the pump chamber: Open the inlet.
The incoming water must not directly impact on the pump. Air pockets may im-
pair the function of the pump.
NOTICE! A different water source may also be used to provide the inlet
quantity required for the test run.
4. When the switch-on level is reached: pump starts (See "Installation/Installation
dimensions" chapter).
5. The pump will run until it reaches the switch-off level: pump stops (See "Install-
ation/Installation dimensions" chapter).
6. Repeat two more pumping processes.
run is finished. The pump can then be used in actual operation.
Installation and electrical connection have been carried out as specified.
Commissioning elements have been checked.
1. Switch on the pump.
Plug in the plug. Switch on the main switch if available.
2. When the switch-on level is reached: pump starts.
3. The pump will run until it reaches the switch-off level: pump stops.
en
21

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Drain tmw 32 60hz

Tabla de contenido