Check Oil In The Sealing Chamber; Stationary Wet Well Installation - Wilo Rexa PRO Instrucciones De Instalación Y Funcionamiento

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 1022
en
6.4.2
Maintenance tasks
6.4.2.1
Rotate impeller
6.4.2.2

Check oil in the sealing chamber

Fig. 4: Sealing chamber: Check the oil
6.4.3

Stationary wet well installation

154
Installation and electrical connection
After a storage period of more than 6 months, carry out the following maintenance
tasks before installation:
▪ Rotate the impeller.
▪ Check the oil in the sealing chamber.
WARNING
Sharp edges on the impeller and suction port!
Sharp edges can form on the impeller and suction port. There is danger of limbs be-
ing severed! Protective gloves must be worn to protect from cuts.
Pump is not connected to the mains!
Protective equipment has been put on!
1. Place the pump horizontally on a firm surface. WARNING! Risk of hands being
crushed. Ensure that the pump cannot fall over or slip away!
2. Reach into the hydraulics housing carefully and slowly from below and turn the im-
peller.
+/-
Fill/drain the oil in the sealing chamber
Pump is not installed.
Pump is not connected to the mains.
Protective equipment has been put on!
1. Place the pump horizontally on a firm surface. The screw plug points upwards.
+/-
WARNING! Risk of hands being crushed. Ensure that the pump cannot fall over
or slip away!
2. Unscrew the screw plug.
3. Place a suitable tank to collect the operating fluid.
4. Drain the operating fluid: Rotate the pump until the opening points downwards.
5. Check the operating fluid:
⇒ If the operating fluid is clear, reuse operating fluid.
⇒ If the operating fluid is contaminated (black), fill with new operating fluid. Dis-
pose of operating fluid in accordance with the local regulations!
⇒ Notify customer service if an operating fluid contains metal chips!
6. Pour in operating fluid: Rotate the pump until the opening points upwards. Fill-in
the operating fluid into the opening.
⇒ Comply with the specifications for operating fluid locations and quantity!
When recycling the operating fluid, check the quantity and if required adjust
it!
7. Clean the screw plug, replace the seal ring and screw it back in. Max. tightening
torque: 8 Nm (5.9 ft lb)!
NOTICE
Pumping problems due to water level being too low
The hydraulics are self-venting. Smaller air cushions are resorbed during pumping. If
the fluid is lowered too much, separation of the volume flow may occur. The min-
imum permissible water level must reach the upper edge of the hydraulics housing!
The pump is installed in the fluid for the wet well installation. For this, a suspension unit
must be installed in the chamber. On the pressure side, the on-site pipe system is con-
nected to the suspension unit and on the suction side to the pump. The connected pipe
system must be self-supporting. The suspension unit must not support the pipe sys-
tem!
WILO SE 2019-02

Publicidad

Tabla de contenido
loading

Tabla de contenido