Descargar Imprimir esta página

Sime Format.zip 25 Solar Manual De Instrucciones página 82

Ocultar thumbs Ver también para Format.zip 25 Solar:

Publicidad

Idiomas disponibles

Idiomas disponibles

NOTE: The boiler must be connec-
IT
ted with an efficient grounding
system. SIME shall not be held
ES
liable for injury or damage resulting from
failure to ground the boiler.
PT
2. 1 2. 1 Electrical panel (fig. 13)
GB
Before performing any kind of operation,
disconnect the unit from the power supply
ATTENTION: After having removed the three screws, take out
the panel to tilt it downward.
KEY
1
Thermohydrometer
2
Time programmer (optional cod. 8092213/14)
4
Main PCB
5
Earth faston
6
Control panel protection
7
Cover (TA)
8
Connector (TA)
9
Fixing screw
82
using the bipolar switch of the plant.
Placing the boiler selector in position "OFF"
does not disconnect the electric board
from the power supply.
Remove the three screws (9) locking the con-
trol panel in place and pull the panel forward
until it can be tilted downward. To access the
components of the electrical panel, unscrew
the four screws holding the protective guard
in place (6).
IMPORTANT: Before performing any kind of operation, disconnect the unit from the power supply
using the bipolar switch of the plant. Placing the boiler selector in position "OFF" does not disconnect
the electric board from the power supply.
1
9
6
7
2 5
8
2. 1 2.2 Room stat connection (fig. 13)
To gain access to connector "TA", remove
the control panel cover (7) and connect the
room stat to the terminals 15-16 after
having removed the jumper.
The thermostat or timer-thermostat,
recommended for better room tempera-
ture control, must be class II as specified
by standard EN 60730. 1 (clean contact).
4
Fig. 13

Publicidad

loading

Este manual también es adecuado para:

Format.zip 30 solar