Descargar Imprimir esta página

Eaton DIN24240DC Manual De Instrucciones página 12

Ocultar thumbs Ver también para DIN24240DC:

Publicidad

Idiomas disponibles

Idiomas disponibles

C C h h a a p p t t e e r r 4 4 E E B B M M I I n n s s t t a a l l l l a a t t i i o o n n
4 4 . . 1 1
M M o o u u n n t t i i n n g g t t h h e e E E B B M M t t o o t t h h e e D D I I N N R R a a i i l l
To Mount the BPDIN24XL EBM:
1.
Locate the top hook of the DIN rail mounting system on the unit with the unit slightly titled.
2.
Rotate the unit till the latch of the rail mount system snaps on to the bottom of the DIN rail and the unit
cannot be rotated any further.
3.
Shake the UPS slightly to ensure that it is secure.
4.
Check if the UPS is facing upright and not tilting downward.
5.
Add additional BPDIN24XL extended battery modules by following the above steps and ensure that each
EBMs are at a minimum distance of 0.39in (10mm) between each module. Up to four EBM modules can
be used per UPS.
Figure 5. Mounting the BPDIN24XL EBM
A A d d j j u u s s t t i i n n g g t t h h e e D D C C U U P P S S E E B B M M o o n n t t h h e e D D I I N N R R a a i i l l
To adjust the EBM:
1.
To adjust the spacing between the DC UPS and EBMs, pull down the on the DIN rail clamp with a flathead
screwdriver or tool to release the clamp.
2.
Tilt up slightly and adjust to desired spacing and snap back onto DIN rail.
3.
Shake the UPS slightly to ensure that it is secure.
Hook to top of the DIN rail
NOTE
Maintain 0.39in (10mm) between devices, 1.97in (50mm) above, and 7.09in (180mm)
below.
Listen for a click to ensure the UPS is secured
to the DIN rail.
Eaton Din Rail UPS Advanced User Guide 934139—Rev A
9

Publicidad

loading

Este manual también es adecuado para:

Din24480dcBpdin24xl