Troubleshooting; Maintenance; Service Intervals; Maintenance And Repair Work - Dräger 200 ECO Instrucciones De Uso

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

4

Troubleshooting

Error
Cause
No filling
Incorrect connection
pressure is
to the gas supply.
generated.
Pump is not working. Restore the power
Safety valve open or
leaking.
Shut-off valve on the
gas supply closed.
The shut-off
End pressure
valve is fully
shutdown not
open.
functioning.
No input
Shut-off valve on the
pressure is
gas supply closed.
displayed.
Gas supply is not
delivering sufficient
pressure.
Input pressure
gauge faulty.
No filling
Filling pressure
pressure is
gauge faulty.
displayed.
Gas is leaking
Connections are not
out of the DOB
gas-tight.
200 ECO.
The filling
Ambient temperature
pressure is too
too high.
low.
Gas supply is not
delivering sufficient
pressure.
Leak in the piston
seals.
5

Maintenance

5.1

Service intervals

Observe the following maintenance intervals and shorten if
necessary, if the filling times are extended by 20 % under
comparable conditions (gas supply pressure, volume of the
compressed gas container to be filled, ambient temperature).
Only allow maintenance measures to be carried out by
authorized expert personnel.
Once a day before use or after every transport of the DOB
200 ECO:
Leak test of the entire DOB 200 ECO (see "Leak test" on
page 23).
Dräger Oxygen Booster 200 ECO
Every 25 operating hours:
Remedy
Ensure a correct
Every 100 operating hours or every 6 months:
connection to the
gas supply.
supply.
Run a function on the
safety valve and
contact an
authorized expert if
Every 200 operating hours or annually:
necessary.
Ensure that the shut-
off valve is open.
Contact an
authorized expert.
Every 1000 operating hours or every 5 years:
Ensure a correct
connection to the
5.2
gas supply and open
the shut-off valve.
Leak test
Ensure a gas supply
of at least 50 bar/
The leak test requires a gas supply with at least 150 bar/
750 psi pressure.
2200 psi and max. 200 bar/2900 psi (type A) or 207 bar/
3000 psi (type B) filling pressure.
Contact an
authorized expert.
The leak test of the DOB 200 ECO should be carried out as
follows:
Contact an
authorized expert.
1. Ensure that the steps from chapter "Preparations for use"
2. If a filling panel is used, make sure the steps from chapter
Contact an
authorized expert.
3. Ensure that any compressed gas containers connected are
Observe the
maximum
permissible ambient
4. Slowly open the shut-off valve on the gas supply.
temperature.
5. Slowly turn the filling valve (fig. 1, pos. 4) to the left and
Ensure a gas supply
of at least 50 bar/
6. Read off the pressure displayed on the inlet pressure
750 psi pressure.
Contact an
7. The pressure displayed must be at least 150 bar/2200 psi.
authorized expert.
8. Close the shut-off valve on the gas supply.
9. Wait for 5 minutes.
10. Read off the pressure again on the input pressure gauge
11. De-pressurize the DOB 200 ECO as described in chapter
12. If the pressure drop on the inlet pressure gauge and on the
Checking the safety valve (see "Checking the safety valve"
on page 24).
Checking the screen inserts and sealing rings of all
connections (see "Checking the screen inserts and sealing
rings for the DOB 200 ECO, the filling panel and the tube
lines" on page 24).
Leak test on all tube lines and connections conducted by
authorized expert personnel.
Check on the drive elements carried out by authorized
expert personnel.
Check of the piston seal carried out by qualified expert
personnel.
Major overhaul by authorized expert.

Maintenance and repair work

on page 20 have been carried out.
"Mounting the filling panel" on page 20 have been taken.
closed. The compressed gas containers are closed when
their shut-off valves cannot be turned any further to the
right.
open fully.
gauge (fig. 1, pos. 2) and on the filling pressure gauge (fig.
1, pos. 5).
and on the filling pressure gauge. The leak test is
successful when no more than 10 bar/145 psi pressure
drop is displayed on the input pressure gage and on the
filling pressure gage than at the start of the test.
"After use" on page 22.
filling pressure gauge is more than 10 bar/145 psi, the
tubes and all connections on the DOB 200 ECO must be
tested for leaks. Damaged hoses and connections are not
permitted for use. All leaky connections must be replaced
by authorized expert personnel. Until that point, the DOB
200 ECO is not permitted to be used.
Troubleshooting
23

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido