1.
Prepare Site
2x6 Backing Material
Matriau de support 2x6
Listón de refuerzo de 2x6
NOTE: To properly secure the vanity, the top of the required 2x6 backing material
must be 32" (81.3 cm) from the floor.
Measure and mark 32" (81.3 cm) up from the floor. This will be the height from
the floor to the top of the 2x6 backing material.
Front-notch the studs 1-1/2" (3.8 cm) to ensure the 2x6 backing material is flush
against the studs.
Secure the 2x6 backing material to the studs with framing nails.
Rough in the water supply and drain lines into the rough-in plumbing area of the
vanity. Refer to the vanity and lavatory "Roughing-In" section for proper
placement.
NOTICE: To avoid the risk of product damage: The finished wall must be straight
and plumb, and the floor flat and perpendicular to the finished wall. If the finished
wall is not straight and plumb, and the floor is not flat and perpendicular to the
finished wall, the vanity will not be properly supported and will cause misalignment
of the lavatory and drawers.
Complete the finished wall. Make sure the finished wall is straight and plumb,
and the floor is flat and perpendicular to the finished wall.
NOTICE: Do not install any moldings that may inhibit the vanity from being flush
against the finished wall.
Préparer le site
REMARQUE: Pour bien fixer le meuble de toilette, le dessus du matériel de renfort
2x6 requis doit se trouver à 32" (81,3 cm) du plancher.
Mesurer et marquer 32" (81,3 cm) vers le haut à partir du sol. Ceci sera la hauteur
entre le plancher et le dessus du matériau de renfort 2x6.
Encocher les montants à l'avant de 1-1/2" (3,8 cm) afin d'assurer que le matériel
de renfort 2x6 soit à ras contre les montants.
Sécuriser le matériau de renfort 2x6 aux montants avec des clous de cadrage.