Descargar Imprimir esta página

Wilo Control AnaCon Instrucciones De Instalación Y Funcionamiento página 29

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

8 Commissioning
CAUTION!
When commissioning, the Installation and operating instructions of the
pump(s) connected to the interface converters must be observed.
NOTE: The commissioning process is described for an AnaCon with pump.
If several AnaCons are present, proceed accordingly.
• Switch on the mains voltage to the pump.
• Switch on the supply voltage to the AnaCon.
• The "Pump Communication" signal lamp (Fig. 1, item 2) must light up green
after approximately 12 s. Check on the pump display whether the automatic
communication build-up between pump(s) and AnaCon via the PLR interface
has taken place: The "double arrow" communication symbol must be visible on
the display (Fig. 3, item 1).
• The function of the control inputs for potential-free control contacts "off",
"max", "min" and "on" (Fig. 2, item 1, 2, 3, 4) can be checked by connecting a
wire bridge.
• Set the required control mode at the "mode" switch (Fig. 1, item 14),
• Set the required setpoint at the "setpoint" knob (Fig. 1, item 15),
• The settings are sent to the connected pump by pressing the button (Fig. 1,
item 16).
• If the analogue input "0-10V" is occupied, it is released by the "set" switch
(Fig. 1, item 17).
9 Maintenance
Maintenance and repair work must only be carried out by qualified personnel.
WARNING! Danger of electric shock
Risks through the electricity supply must be prevented.
For all maintenance and repair work, the interface converter/pump(s)/plant
must be switched off at the mains and protected against unauthorised
switching on again.
Installation and operating instructions Wilo-Control AnaCon
English
25

Publicidad

loading