Descargar Imprimir esta página

Wilo -Flumen OPTI-TR 22 Instrucciones De Instalación Y Funcionamiento página 20

Ocultar thumbs Ver también para Wilo-Flumen OPTI-TR 22:

Publicidad

Idiomas disponibles

Idiomas disponibles

en-US
6.4.1
Maintenance work
20
Installation and electrical connection
CAUTION
Material damage due to incorrect fixation
Incorrect fixation may limit the functionality of the mixer or damage it.
• If the mixer is fixed to a concrete structure, use anchor bolts for fixation. Follow the
manufacturer's installation instructions! Temperature specifications and hardening pe-
riods must be strictly observed.
• If the mixer is fixed to a steel structure, ensure that the structure is sufficiently strong.
Use fixation materials with sufficient strength!
Use suitable materials to avoid electrochemical corrosion!
• Tighten all screwed connections. Observe torque specifications.
ƒ
Wear protective equipment! Observe the work regulations.
Protective gloves: 4X42C (uvex C500)
Safety shoes: Protection class S1 (uvex 1 sport S1)
Wear a safety harness where required!
Safety helmet: EN 397 Conforms to standards, protection against lateral deformation
(uvex pheos)
(When using lifting equipment)
ƒ
Prepare installation site:
Clean, free of coarse solids
Dry
Frost-free
Disinfected
ƒ
Work must always be carried out by two persons.
ƒ
Demarcate the working area.
ƒ
Unauthorized persons must be kept away from the working area.
ƒ
From a working height of more than 1 m (3 ft) above the ground, use scaffolding with a
safety harness.
ƒ
Toxic or asphyxiating gases may build up during work:
Observe protective measures according to work regulations (gas measurement, carry
gas warning device with you).
Ensure sufficient ventilation.
If toxic or asphyxiating gases accumulate, leave the workplace immediately!
ƒ
Install lifting equipment: even surface, clean, firm bearing surface. Storage location and
installation site must be easily accessible.
ƒ
Attach chain or wire rope to handle/attachment point with a shackle. Only use techni-
cally-approved lifting gear.
ƒ
Do not stand in swivel range of hoist.
ƒ
Install all connection cables properly. No risk (tripping hazard, damage during operation)
must be posed by the connection cables. Check whether the cable cross-section and the
cable length are sufficient for the selected installation type.
ƒ
Observe minimum clearances to walls and any fixtures.
After a storage period of more than 12 months, carry out the following maintenance tasks
before installation:
ƒ
Rotate the propeller.
See section "Rotating the propeller [} 36]".
ƒ
Change oil in seal housing.
See section "Oil change [} 37]".
WILO SE 2021-10

Publicidad

loading