Descargar Imprimir esta página

Wilo -Flumen OPTI-TR 22 Instrucciones De Instalación Y Funcionamiento página 32

Ocultar thumbs Ver también para Wilo-Flumen OPTI-TR 22:

Publicidad

Idiomas disponibles

Idiomas disponibles

en-US
8
Decommissioning/removal
8.1
Personnel qualifications
8.2
Operator's obligations
8.3
Decommissioning
8.4
Removal
32
Decommissioning/removal
ƒ
Operation/control: Operating personnel, instructed in the functioning of the complete
system
ƒ
Electrical work: qualified electrician
Someone with suitable technical training, knowledge and experience who can identify
and avoid the dangers associated with electricity.
ƒ
Installation/dismantling work: trained sewage technology professional
Fixation to different construction parts, lifting equipment, wastewater facility basics
ƒ
Lifting work: trained professional for operating lifting devices
Lifting equipment, lifting gear, attachment points
ƒ
Locally applicable accident prevention and trade association safety provisions.
ƒ
Observe all regulations for working with and underneath heavy suspended loads.
ƒ
Make available the required protective equipment and ensure that the personnel wear
the protective equipment.
ƒ
Ensure sufficient aeration in closed rooms.
ƒ
If toxic or suffocating gases build up, immediately initiate countermeasures!
The mixer is deactivated, but remains installed. This ensures that the mixer is always ready
for operation.
To protect the mixer from frost, ice and direct sunlight, immerse the mixer completely
in the fluid.
Minimum fluid temperature: +3 °C (+37 °F).
1. Switch off the mixer.
2. Secure the operating point against being switched on again by unauthorized persons
(e.g. lock main switch).
▶ The pump has been decommissioned and can be dismantled.
If the mixer remains installed after decommissioning, observe the following:
ƒ
Ensure that the aforementioned requirements are maintained for the complete period of
decommissioning. If these requirements cannot be guaranteed, remove the mixer!
ƒ
For an extended period of decommissioning, carry out a function test at regular intervals:
Period: monthly to quarterly
Running time: 5 minutes
Run a function test in valid operating conditions only!
DANGER
Danger due to fluids which are hazardous to health!
Danger of bacterial infection!
• Disinfect the mixer after removal!
• Observe information from the work regulations!
DANGER
Electrocution hazard!
Improper conduct when carrying out electrical work causes death due to electric shock!
• Electrical work must be carried out by a qualified electrician!
• Observe local regulations!
WILO SE 2021-10

Publicidad

loading