Balluff BMD 1L Serie Manual De Instrucciones página 148

Ocultar thumbs Ver también para BMD 1L Serie:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

9 Diagnostics and servicing
60
Note:
When exchanging the rod or cable, make sure that the instrument and
the new rod or cable are dry and clean.
surface, provide counterforce with another fork wrench.
the measuring rod.
3. Unscrew the loosened rod or cable manually.
4. Insert the new measuring rod carefully by hand with a screwing
5. Continue screwing in the rod manually into the opening of the pro-
6. Exert counterforce with the second fork spanner and tighten the
Rod ø 8, cable ø 2 and 4: 6 Nm (4.43 lbf ft)
Rod ø 12: 10 Nm (7.37 lbf ft)
Fig. 32: Exchange cable or rod
Information:
of the connection remains.

Publicidad

Tabla de contenido
loading

Tabla de contenido