AKM Installation | 11 Record of document revisions
11 Record of document revisions
Revision Remarks
01 / 2009 First multilingual edition
06 / 2010 Appendix renamed to Drawings, AKM8 added, symbols according to ANSI Z535, Hiperface added,
minor corrections, technical data moved to appendix, new windings for AKM4 to 7, radial-/axial force
diagrams new for AKM1 to 8
10 / 2010 Transport tool order information, wiring diagrams updated for H connector
12 / 2010 Weight data AKM8, derating AKM8, DIN 748 => EN 50347, company name&address
04 / 2011 Washdown Variants, some minor corrections, climate categories, flange temperature limit
12 / 2011 EnDat encoders RoHS compliant, SFD combi connector option "D", GOST-R certificate, AKM8
dimensions corrected, AKM7 transport, Washdown Food
03 / 2012 AKM3: FRmax corrected, Washdown Food information extended, peak current/torque data AKM1 to
AKM7 updated
08 / 2012 AKM 1 extended options, wiring diagrams removed, connector pinout section added, KTY thermal
sensor version added, CE certificate, part number scheme extended
04 / 2013 Brake data, y-tec power pinout corrected, AKM 7 fan option, i-tec connector new, KTY thermal
sensor version updated
04 / 2014 Hint for 65°C max. flange temp. removed, data 65M 480V updated, SpeedTec Ready connector for
AKM4 to 7 (dimension drawings updated), AKM83V added
06 / 2014 Layout change, 6 languages version
11 / 2014 Technical data Peak Current Sym/Unit corrected, AKM72Q/73Q with fan added, connector option H
extended for AKM7xQ, data AKM83V updated, connector option D: SFD(PTC)/SFD3-DSL(KTY),
certificates removed, GOST-R removed
12 / 2014 Technical data holding brakes updated, Connector-Feedback relationship table new
04 / 2015 EAC certification, connector/feedback tables optimized, Molex connectors removed, shaft seal
run-in added,FR/FA diagram for AKM8 with enforced bearing added, AKM 2/3 SpeedTec con-
nectors, RoHS and REACH statements added
192
Kollmorgen | April 2015